BBT ARCHITECTS OCTOBER 2006
- JUNE 2012 |
WEBSITE |
|
|
|
WWW.BBTARCHITECTS.COM |
|
|
|
PROJECT NAME |
LOCATION |
YEAR |
PROJECT
DESCRIPTION |
ROLE |
|
|
|
|
|
COUTIN PROFESSIONAL BUILDING |
BEND,
OREGON |
2006-07 |
6,000SF, 2-STORY MEDICAL / GENERAL OFFICE BUILDING |
DESIGNER, PROJECT MANAGER |
KID'S CENTER |
BEND,
OREGON |
2007 |
ADDITION TO EXISTING BUILDING FOR A NON-PROFIT, CHILD ABUSE
PREVENTION CENTER |
CONSTRUCTION ADMIN |
DESCHUTES CHILDREN'S FOUNDATION, EAST BEND CAMPUS |
BEND,
OREGON |
2007 |
A NEW 14,000 SF FACILITY FOR
HOUSING MULTIPLE ORGANIZATIONS DEDICATED TO THE PROTECTION AND
WELLBEING OF CHILDREN IN CENTRAL OREGON |
PROJECT MANAGER, CONSTRUCTION ADMIN |
MERCATO |
BEND,
OREGON |
2006-09 |
A NEW, 360,000 SF MIXED-USE PROJECT IN THE OLD MILL DISTRICT OF
BEND, OREGON. BASED ON THE IDEA OF THE ITALIAN MERCATO, A MIX OF SPECIALTY
FOOD VENDORS AND CULINARY STORES OPENED ONTO A LARGE MARKET HALL. THE FLOOR
ABOVE THE FIRST FLOOR WERE EITHER CLASS A OFFICE SPACE OR HIGH END
RESIDENCES. |
DESIGN IN COLLABORATION WITH BCV ARCHITECTS IN SAN FRANCISCO,
PROJECT MANAGER |
REDMOND CITY HALL (UNBUILT) |
REDMOND,
OREGON |
2007-09 |
A NEW 35,000 SF 3-STORY CITY HALL FOR THE CITY OF REDMOND,
OREGON. THE NEW FACILITY WAS TO CONSOLIDATE SEVERAL DEPARTMENTS UNDER ONE
ROOF. LEED SILVER CERTIFIED |
DESIGN LEAD, PROJECT ARCHITECT |
REDMOND CENTENNIAL PARK |
REDMOND,
OREGON |
2007-09 |
A NEW DOWNTOWN CIVIC PLAZA SITUATED ACROSS THE STREET FROM THE
EXISTING CITY HALL. DESIGNED IN CONJUNCTION WITH WALKER MACY OUT OF PORTLAND,
OREGON, THE PARK FEATURES A LARGE PLAZA AREA WITH A COMPUTER CONTROLLED
FOUNTAIN, A 800 SF BUILDING WHICH HOUSES A RETAIL SPACE, AND TWO RESTROOMS,
AND A LARGE GRASS AND TREE AREA.. |
DESIGN LEAD, PROJECT ARCHITECT |
US DEPARTMENT OF LABOR WOLF CREEK CIVILIAN CONSERVATION
CENTER (JOB CORP) |
GLIDE,
OREGON |
2007-2010 |
A NEW 8,000 SF CAFETERIA FOR THE WOLF CREEK COCC LOCATED IN
GLIDE OREGON. THE EXISTING FACILITY WAS FALLING DOWN AND THIS NEW FACILITY
WAS TO REPLACE THE EXISTING. PER GOVERNMENT STANDRADS, THIS PROEJCT WAS
DESINGED TO PREFOMR 30 % BETTER THAN ASHRAE 90.1 STANDARDS. THIS PROJECT IS CURRENTLY UNDER
CONSTRUCTION |
DESIGN LEAD, PROJECT ARCHITECT |
MT. BACHELOR ADMINISTRATION BUILDING |
MT
BACHELOR, OREGON |
2009 |
A NEW 14,000 SF, 2-STORY ADMINISTRATION BUILDING FOR MT.
BACHELOR SKI RESORT |
DESIGN LEAD |
COLLEGE PLACE COMMUNITY BANK |
WALLA
WALLA, WASHINGTON |
2009-2010 |
A NEW 30,000 SF, 3-STORY BUILDING IN WALL WALLA, WASHINGTON TO
BE THE REGIONAL HEADQUARTERS FOR COMMUNITY BANK. |
DESIGN LEAD |
IRIS-WARD BUILDING ADDITION |
BEND,
OREGON |
2010 |
A 900 SF ADDITION ONTO AN EXISTING 2-STORY BUILDING. |
DESIGN LEAD, PROJECT ARCHITECT, CONSTRUCTION ADMIN |
La PINE EVENTS CENTER REMODEL |
LA PINE,
OREGON |
2010-2011 |
REMODEL OF AN EXISTING EVENTS CENTER FOR THE LA PINE PARKS AND
REC DEPARTMENT. THE REMODEL WAS ON AN EXTREMELY TIGHT BUDGET, AND THE
FACILITY NEEDED A LOT OF WORK. THIS PROJECT WAS TO BE BROKEN IN 3 PHASES.
PHASE 1 COMPLETED IN FALL 2011. |
DESIGN LEAD, PROJECT ARCHITECT |
IRIS-WARD BUILDING LOBBY |
BEND,
OREGON |
2011 |
LOBBY FINISH OUT FOR THE IRIS-WARD BUILDING. THE FINISH OUT
INCLUDED THE MAIN ORNAMENTAL STAIR, CEILING, FLOOR AND FLOOR FINISHES |
DESIGN LEAD, PROJECT ARCHITECT, CONSTRUCTION ADMIN |
FOCUS PHYSICAL THERAPY |
BEND,
OREGON |
2011 |
A
1,900 SF TENANT IMPROVEMENT IN THE IRIS-WARD BUILDING FOR A PHYSICAL THERAPY
PRACTITIONER. |
DESIGN LEAD, PROJECT ARCHITECT, CONSTRUCTION ADMIN |
OREGON DEPARTMENT OF TRANSPORTATION PLAN DELIVERY BUILDING |
BEND,
OREGON |
2011 |
A NEW 20,000 SF, 2-STORY FACILITY TO CONSOLIDATE 9 DEPARTMENTS
INTO ONE BUILDING AND TO START TO ESTABLISH A CAMPUS FOR ODOT. LEED SILVER
EQUIVALENT |
DESIGN LEAD, PROJECT ARCHITECT |
INTERPATH LABORATORIES HEADQUARTER BUILDING |
PENDLETON,
OREGON |
2011 |
A NEW 35,000 2-STORY BUILDING FOR INTERPATH LABS. THIS BUILDING
WILL HOUSE A PHLEBOTOMY LAB AND CLINIC SPACE ON THE FIRST FLOOR AND THE
SECOND FLOOR WILL BE THE OFFICE SPACE FOR DIFFERENT DEPARTMENTS AND FOR THE
EXECUTIVES OF THE COMPANY. THIS PROJECT IS CURRENTLY UNDER CONSTRUCTION. |
DESIGN LEAD, PROJECT ARCHITECT |
CENTRAL OREGON COMMUNITY COLLEGE CAMPUS SIGNAGE |
BEND,
OREGON |
2011-2012 |
A NEW CAMPUS SIGNAGE DESIGN AND PLAN FOR COCC. SIGNS VARYING IN
USE FROM PEDESTRIAN SIGNS, VEHICULAR SIGNAGE, AND BUILDING SIGNAGE. THIS
PROJECT IS ON-GOING |
DESIGN LEAD, PROJECT ARCHITECT |
CENTRAL OREGON COMMUNITY COLLEGE REDMOND TECH BUILDING |
REDMOND,
OREGON |
2011-2012 |
A NEW 30,000 SF, 2-STORY TECHNOLOGY CENTER FOR COCC. THIS
BUILDING WILL HOUSE SEVERAL COMPUTER LABS, CLASSROOMS, SHOPS FOR TECHNOLOGY
TRAINING, AND A LARGE MULTI-USE AUDITORIUM. LEED PLATINUM CERTIFIED GOAL |
DESIGN LEAD |
CENTRAL OREGON COMMUNITY COLLEGE CHANDLER BUILDING REMODEL |
BEND,
OREGON |
2012 |
THE EXISTING CHANDLER BUILDING WAS BUILT MORE THAN 50 YRS AGO
AND NEEDED TO BE BROUGHT UP TO ADA STANDARDS. THE MAJOR COMPONENTS OF THIS
ARE A LARGE RAMP ADDITION TO THE FRONT OF THE BUILDING, RESTROOMS, CLASSROOM
REMODEL, MEETING ROOM REMODEL AND (6) ADD ALTERNATES. |
PROJECT ARCHITECT, CONSTRUCTION ADMIN |
ROBBERSON FORD CUSTOMER LOUNGE REMODEL |
BEND,
OREGON |
2012 |
LOCAL FORD DEALERSHIP WANTED TO UPDATE THEIR CUSTOMER LOUNGE.
THE EXISTING ROOM HAD LOW CEILING, SOLID WALLS, AND USED FURNITURE AND
FINISHES. THE NEW REMODEL ADDED A LARGE SKYLIGHT, EXPOSED THE CEILING JOISTS
AND ROOF BEAMS, ADDED A LARGE GLASS WALL AND UPDATED THE FINISHES. |
DESIGN LEAD, PROJECT
ARCHITECT |
ROBBERSON FORD QUICK LANE ADDITION |
BEND,
OREGON |
2012 |
AN ADDITION FOR THE QUICK LANE BUILDING FOR ROBBERSON FORD. THE
ADDITION IS 300 SF AND WILL EXPAND THE WAITING AREA AND ALSO UPGRADE THE
FINISHES TO MAKE CUSTOMERS MORE COMFORTABLE. |
DESIGN LEAD, PROJECT ARCHITECT |
MID COLUMBIA LIBRARIES - WEST PASCO BRANCH |
PASCO,
WASHINGTON |
2012 |
A NEW 6000 SF BRANCH LIBRARY FOR THE MID-COLUMBIA LIBRARIES
SYSTEM. DUE TO NEED, THE MCLS PARTNERED WITH A DEVELOPER TO CONSTRUCT A NEW
BRANCH LIBRARY. THE BRANCH WILL PROVIDE SERVICES FOR THE WEST PASCO
COMMUNITY. THE DEVELOPMENT WILL INCLUDE A LARGE OFFICE COMPLEX THAT WILL
HOUSE BOTH OFFICE SPACE AND MEDICAL OFFICES. |
BROUGHT
PROJECT RFP INTO OFFICE FOR CONSIDERATION, DESIGNED AND DEVELOPED PROJECT
UNTIL DESIGN DEVELOPMENT, CLIENT INTERACTION, |
|
|
|
|
|
MIXED
IN WITH THE ABOVE PROJECT WORK LOAD, I ALSO GENERATED NUMEROUS MASTER PLANS
FOR DEVELOPMENT PROJECTS, CONCEPTUAL SITE PLANS FOR MARKETING PROPOSALS, AND
ASSISTED COLLEAGUES WITH PROJECT VISUALIZATION AND DESIGN SUPPORT. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|